Tuesday 14 June 2016

Verb Sentences


6 comments:

Anonymous said...


1. Mr. Abu communicates well with others.

2. The jig will be installed on the factory floor.

3. The technician will maintain the machine every fortnight.

4. They assemble the machine together.

5. She compiles all the documents altogether.

6. The worker receives their salary by the end of the month.

7. Mr. Lee announces his retirement.

8. The programmer jogs the robot in a safe speed range.

9. The forms need to be approved by your manager.

10. Ali tags the completely inspected machine.

Prepared by:
LUQMANUL HAKEEM BIN MOHAMED HABIBOLLAH
MUHAMMAD IRFAN BIN ANUAR

Anonymous said...

Anonymous Anonymous said...
1- I will update the matter to your supervisor tommorow.
2- Ms.Mariam should distribute the task into four teams so they can work systematically .
3- J.K Wire Harness receives new order from each automotive manufacturer every 6 month .
4- The two guys quarrel over the meeting about the salaries .
5- She must monitor the progress of the looping program.
6- I want to install Autocad software on my computer.
7- Tomorrow, Mr. Chan will move to another department.
8- That technician identifies the damage on air driver.
9- This morning, my supervisor rejects my report because too many mistake.
10-We must apply 5S system in our workplace.

Prepared by: AHMAD RABBANI BIN MOHD AMIN
MUHAMMAD AIMAN SYAHIR BIN MAHMUD

Anonymous said...

1) Aminah compiles all the files together into one place.
2) Encik Raju distributes the uniform to the newcomer that arrived in the company this morning.
3) The maintenance operator tag out the machine so that the other employees aware about it.
4) 'You should communicate with your colleague so that it will easier to get the done', said Encik Abu to his worker.
5) 'Will you reprogram for me because I lost my computer last night?'said Encik Selamat to Encik Selimut.
6) Ali presses the emergency stop button to stop the machine.
7) He installs the component while repair the machine.
8) He stores the tools in a toolbox.
9) The supervisor supervises his worker to ensure them do their work.
10) He emails a report about an issue that happen thus morning.
11) He cleans the workplace after finishing his work.
12) Dayana fills the new brake oil into the car.
13) Radiatul Adawiyah draws the schematic diagram for the sludge pump.
14) Puteri calculates the cost for the new machine.
15) The operators apply for the new safety boots.

Prepared by :
MUHAMMAD HUSAINII
MUHAMMAD SYUKUR
MOHAMAD SYAZWAN

Anonymous said...

1. He compiles the tools in the right place.
2. Jamal operates the machine carefully.
3. Samad verifies that the task is complete.
4. He begins work at 10.00 a.m.
5. Said plugs-in the plug cable.
6. We must train our technicians to be more expert on those machines.
7. Please retrieve your tools after your job is done.
8. You shall achieve a good level of your KPI's if you do your job with tremendous effort.
9. Abu measures the reading of voltage and current by using multi-metre all by himself.
10. You will realize that this electrical schematic drawing is actually easier than you think in just a glance.

Prepared by : Noor Zaidi and Saiful Islam

Anonymous said...


1- The supervisors install the program into the machine.

2- I will update your information to the HR department.

3- The supervisors verify my medical leave form.

4- I will discuss about the project with line leader.

5- The line leader agree with the technician to change a new part on the machine.

6- The supervisors design a new product for this year.

7- The technicians measure the shaft.

8- The quality control departments reject the product.

9- The quality control departments inspect the new product.

10-The company achieves total of 200 products a weeks.


Prepared By:
Mohd Shafiq Khairil Bin Mohd Zain
MOHAMMAD Shahrezal Bin Othman

Anonymous said...




1- The Engineers reprogram the CNC machine as request from the customer .
2- Haris installs the new software based on manager's order.
3- Syafiq must complete the report and send to the supervisor by today.
4- Mr. Malik rejects my report as it is not completed.
5- Hazwan will replaces Bani's position after Hari Raya Aidilfitri.
6- Yuna tests the durability of the product by using chemical method.
7- Our team plans to build new product before end of the year.
8- The new staff should join our team to fill empty position.
9- Everybody must switch off the machine after using it.
10- The supervisor reminds all staff to always keep the lab clean all the time.


Prepared by:-
= Muhammad hazwan bin Sepire
= Suhaimi bin Salamet.